Certificate of Public Convenience and Necessity: Hampton-Rochester-La Crosse

The CapX2020 utilities e-filed a Certificate of Public Convenience and Necessity (see press release) on December 21, 2010 with the Public Service Commission of Wisconsin (PSCW) for the Hampton-Rochester-La Crosse 345 kV transmission line project.

All landowners, regardless if they have property within a route option, are encouraged to continue attending meetings and participating in the public process. The PSCW ruled the CPCN application complete on June 9, 2011.

If you have questions about the CPCN application or current project status, please call 1-800-238-7968, use the online form at www.capx2020.com/contactus.html or email lacrosseinfo@capx2020.com.
 

Application to the Public Service Commission of Wisconsin (PSCW) for the Hampton-Rochester-La Crosse 345 kV transmission line project (PSCW ruled application complete on June 9, 2011)
The linked documents below are in Adobe PDF file format.
Detailed route maps are located in Appendix C.
Filing Order
File Name File Content Size
1 Cover_Letter_Joint_Application_CapX 2020_HRL_345_kV_Transmission_ Project.pdf Cover Letter
Table of Contents
Introduction and Overview
V17C Application Filing Requirements
Part 2.00
7.5 MB
Application Appendices
2
Appendix_A.pdf Appendix A – Certificate of Public Convenience and Necessity Impact Tables 297 KB
3
Appendix_B.pdf Appendix B – Topographic Maps 7.2 MB
4
Appendix_C_Part_1_of_2.pdf Appendix C – General Route Maps 8.9 MB
5
Appendix_C_Part_2_of_2.pdf Appendix C – General Route Maps 9.7 MB
6
Appendix_D_Part_1_of_2.pdf Appendix D – Environmental Features Maps 8.8 MB
7
Appendix_D_Part_2_of_2.pdf Appendix D – Environmental Features Maps 9.4 MB
8
Appendix_E.pdf Appendix E – Transmission Studies Summary Report 7.7 MB
9
Appendix_F.pdf Appendix F – Mississippi River Crossing Analysis 7.0 MB
10
Appendix_G.pdf Appendix G – PDA for the Hampton-Rochester-La Crosse 345 kV Transmission System Improvement Project 518 KB
11
Appendix_H.pdf Appendix H – Environmental Impact Fee Tables 55 KB
13
Appendix_J.pdf Appendix J – Q1-Highway 35 Construction Plan 1.6 MB
14
Appendix_K.pdf Appendix K – Staging Areas and Substation Sites 3.6 MB
15
Appendix_L.pdf Appendix L – Pole Diagrams 393 KB
16
Appendix_M.pdf Appendix M – Route Development and Considered but not Proposed Routes 508 KB
17
Appendix_N_Part_1_of_2.pdf Appendix N – Original Q1 Route Information 8.9 MB
18
Appendix_N_Part_2_of_2.pdf Appendix N – Original Q1 Route Information 2.6 MB
19
Appendix_O_Part_1_of_2.pdf Appendix O – Great River Road Visual Assessment 9.1 MB
20
Appendix_O_Part_2_of_2.pdf Appendix O – Great River Road Visual Assessment 1.7 MB
21
Appendix_P.pdf Appendix P – Agency and Tribal Correspondence 9.8 MB
22
Appendix_Q.pdf Appendix Q – Zoning Maps 1.4 MB
23
Appendix_R_Part_1_of_2.pdf Appendix R – Land Use Plans 6.7 MB
24
Appendix_R_Part_2_of_2.pdf Appendix R – Land Use Plans 5.0 MB
25
Appendix_S.pdf Appendix S – Airports and Airstrips 582 KB
26
Appendix_T.pdf Appendix T – Utility Permit Application 2.0 MB
27
Appendix_U.pdf Appendix U – Electric and Magnetic Fields (EMF) Information 1.6 MB
28
Appendix_V.pdf Appendix V – Informal Discovery Requests from PSCW Staff 8.4 MB
29
Appendix_W_Part_1_of_2.pdf Appendix W – Supplemental Connector Information 9.1 MB
30
Appendix_W_Part_2_of_2.pdf Appendix W – Supplemental Connector Information 8.5 MB